Process and Facility

Procedures

  • Step 1. Material warehousing

    The process of purchasing raw and subsidiary materials and storing them in a warehouse

  • Step 2. Making
    yarns process

    After melting polypropylene with heat to make film sheet, the size of the yarn is fixed by knives to produce necessary yarns

  • Step 3. Weaving process

    After setting the yarn to a fixed standard we maintain the machine condition and weave the fabric

  • Step 4. Coating process

    The process of setting the thickness of film made out of raw materials and coating the woven fabric

  • Step 5. Cutting process

    The process of cutting or piercing the fabric and subsidiary materials according to specification.

  • Step 6. Sewing process

    The process of using the sewing thread to sew parts of fabrics and subsidiary materials.

  • Step 7. Inspection and packaging process

    The process in which a product’s foreign substances, sewing condition, appearance, specification, etc. are inspected and a finished product gets packed.

  • Step 8. Shipment

    Safe delivery of the product to customers and condition check

    Separate Processes

  • Liner extrusion process

  • Liner sealing,
    inspection process

언어 설정

kor eng

NAMKANG Co., Ltd. Address : 30 Yeongdong 1-gil (Sanmak-dong) Yangsan-si, Gyeongsangnam-do / Company Registration no. 691-86-00402 / TEL : 055-384-8154 / FAX : 055-384-8552

산업용포장재, 톤백 , FIBC , bulk bag , Container Liner , Al LINER , B/S LINER 제작업체

Copyright © NAMKANG Co., Ltd.. All rights reserved.